Bushcat Build Log

  • Fuel line installation

    Aircraft: Bushcat 19-2226
    Task Date: 30/08/2025
    Builder: Malcolm Hardy
    Category: Fuel System
    Section: 52
    Hours: 1.5 hrs
    Task: Fitted fuel lines. The distance between the gascolator and fuel pump was greater then the length of fuel line supplied. I have used one of the other longer sections and have ordered more fuel line.  More...
  • Flap pushrod installation

    Aircraft: Bushcat 19-2226
    Task Date: 30/08/2025
    Builder: Malcolm Hardy
    Category: Controls
    Section: 40
    Hours: 1 hr
    Task: Fitted flap bellcranks. Locitite used on all bolts. Torque Seal applied to nuts.  More...
  • Backrest installation

    Aircraft: Bushcat 19-2226
    Task Date: 24/08/2025
    Builder: Malcolm Hardy
    Category: Fuselage
    Section: 44
    Hours: 1 hr
    Task: Fit seat backs.  More...
  • Safety Belt Installation

    Aircraft: Bushcat 19-2226
    Task Date: 24/08/2025
    Builder: Malcolm Hardy
    Category: Fuselage
    Section: 43
    Hours: 3 hrs
    Task: Fitted seat belts. I have contacted Errol as the drawings for the lap belt attachment are not very clear and there are no photographs.  More...